BUILDING:
MAST II COMMUNITY CHARTER SCHOOL-PHASE 1

For the MaST Community Charter School, BSI provided construction management services for phase one of the school’s Tacony campus. The project included full site improvements to 19 acres fronting the Delaware River at the foot of the Tacony Palmyra Bridge. The project included the following site improvements:
• Import of 60,000 cubic yards of residential clean fill to new grade elevations
• Storm water management including a Rain Garden and Outflow Structure to the Delaware River
• New sanitary system
• Domestic and fire water services
• Site concrete
• Topsoil & seeding of new multipurpose athletic field
• Paved parking & circulation drives
• Modifications to city street intersections including Traffic Signalization Upgrades
• Building pad development
The school is a newly constructed three-story 54,000 square foot structure consisting of classrooms, a multipurpose room, full commercial kitchen, library, maker space and administrative offices. The building utilizes the elements of the exposed structure in its design throughout. The design of the building also allows for future expansion and connection to a second building in phase two. MaST II Community Charter School-Tacony Campus will serve grades K through 12 upon completion of both Phase phase one and two.


“We worked closely with BSI on MaST Community Charter School’s new Tacony campus.  From initial planning through to construction closeout, BSI was a valuable team member.

Their initial cost model enabled the design team to make material and system selections, but had enough latitude for design refinement as documentation advanced.  During construction, BSI brought a skilled and cooperative team of trade contractors into the field and was proactive in the coordination of details. We welcome the opportunity to work together on future projects.”
— Keith Fallon, RA, Executive Vice President, EwingCole

TRUST:


SECTOR: Education


OWNER: MaST Community Charter School

ARCHITECT: EwingCole

LOCATION: Philadelphia, PA

SERVICE: Construction Management

SQ.FOOTAGE: 54,000 sq. ft

BUDGET: $17,854,000

DURATION: 15 months


Exterior of a modern building with a sign reading 'MAST I TACONY CAMPUS' and a tree with autumn leaves.
Underneath a modern yellow building with a large overhang, a sidewalk lined with small trees leads towards a bridge in the distance, with parking lot and cars visible on either side.
Modern multi-story building with gray exterior, large glass windows, and yellow accents, set against a clear blue sky with trees and a crosswalk in the foreground.
Modern building with gray metal siding and a large yellow rectangular frame around a glass window and balcony.
Modern building with gray metal siding, yellow accent wall, glass entrance doors, and a manicured lawn in front.
Lobby area of a school entrance with chairs, a table, and doors leading outside. The ceiling has exposed piping and lighting, with a railing on an upper level.
Long corridor in school or gym with yellow walls, gray lockers, and checkered black and white flooring, leading to a glass door at the end.
Modern commercial building with metal siding and yellow accents, situated in a parking lot with few cars and trees, under a clear blue sky.
Modern building behind a grassy field with a netted soccer goal and a playground on the left.
Empty conference room with colorful chairs stacked near a blue accent wall, large windows, and mounted TVs.
Indoor corridor with large windows, modern ceiling with exposed pipes and lighting, and a seating area with green chairs.
Empty classroom with orange chairs, white desks, large windows showing a view of the outdoors, and modern ceiling lights.
Interior of an office with large windows, ceiling-mounted green and yellow acoustic panels, and a dark carpeted floor.