PROJECTS

EDUCATION

Colorful area in a library or community center with rainbow-striped carpet, bookshelves, seating area near large windows, and holiday decorations.

BUILDING:
MAST III COMMUNITY CHARTER SCHOOL

BSI Construction recently completed Phase One of the MaST III Community Charter School’s Facility at the former Crown, Cork, & Seal Corporate Headquarters located in Northeast Philadelphia. The Project consisted of converting high end corporate office space into classroom, library, maker space, and innovative learning spaces.  In support of these spaces, additional toilet facilities were implemented into the alterations to accommodate the increase in occupancy from 300 corporate employees to a future occupancy of over 1600 students, faculty, and staff.  The roof top mechanical units were replaced with custom units to provide the requirements of fresh air, heating, and cooling.  Along with the mechanical units replacement, there were substantial duct modifications, installation of variable air volume terminals, and building management system upgrades.  The original 20 year old lighting was replaced with LED fixtures, daylight harvesting dimming controls and color tuning technology.  The Fire Alarm system was upgraded to conform with the new building use including voice evacuation.  A new decorative stair with a glass rail system was installed in the main lobby connecting the ground floor Kindergarten & First Grade Classroom Pods to the Main Floor.  The challenge of the project was the aggressive schedule: 154,000 square feet of interior space modified in five months at a cost of $10,100,000.00.  Future Phases for this facility include the construction of a separate Gymnasium Building, Outdoor Classrooms, and Athletic Fields.


The success of this project was rooted in the relationship and teamwork between the Client (Mast), the Architect (Ewing Cole), and BSI Construction. MaST III was the second opportunity for this team to create a unique and impressive facility under the constraints of a difficult timeline.

TRUST:


SECTOR: Education


OWNER: MaST III Community Charter School

ARCHITECT: Ewing Cole

LOCATION: Philadelphia, PA

SERVICE: Construction Management

SQ.FOOTAGE: 154,000 sq. ft

BUDGET: $10,100,000.00

DURATION: 5 months


Modern multi-story office building with glass windows and landscaped front yard with evergreen trees and bushes.
Modern multi-story glass and stone building with a large grassy lawn and blooming trees in front.
Interior of a modern multi-story office building with glass railings, large windows, and open space.
Modern indoor staircase with glass railings and striped carpet flooring.
Interior view of a modern multi-story building with glass railings, white walls, and natural light from windows.
Modern interior space with a staircase and glass railing, large windows revealing trees outside.
A school hallway with frosted glass window partitions decorated with colorful artwork and writing, extending towards an exit with bright sunlight.
Modern indoor staircase with glass railings and metal handrails, leading downward with sunlight streaming in through large windows.
Empty modern indoor walkway with large windows letting in sunlight, casting shadows on the dark floor, and white columns supporting the ceiling.
Empty hallway in a school with blue and yellow chairs, decorated classroom doors with snowmen and winter theme, and area with windows displaying holiday cheer.
Interior of a modern multi-story building with large glass windows showing trees outside. The building features open corridors with metal and glass railings, and a view of the outdoors including green grass and trees.